Moreton Bay Boy's College, Qld

The brief here was to construct a 2 storey, fire rated 600m2 four class room building on an environmentally sensitive site, during the school term (construction noise was a major concern) in a limited timeframe.

The construction began in late August, was completed to ‘lock up’ in September and handed over in December some 2 months ahead of schedule.

There was a minimum of disturbance to the ecologically sensitive site and virtually no disturbance to the students in adjacent classrooms.

The scope required a high STC (sound transmission) and using Force 10’s unique floor system, we far exceeded the scoping requirements.

The picture depicts the ‘mega-anchor’ and floor system used which was a key element in beating the timeframe and was in place in 5 days.

QLD

(07) 3716 2002
30 Acanthus Street, Darra, QLD, 4076

For further details on how to contact us, please click the link below.

Further contact details

This versatile 117m2 single storey home was designed to blend in with suburban Victoria. A simple 3 bedroom layout with spacious living…

More

All aspects of the Force 10 system have been tested to an extensive degree and certified by many authorities including the foremost…

More

… A Better Way To Build!